Letter from Continental Corporation for their Cedal Aluminum Facility
Important Note:
This letter is a translation of the original letter from Continental Corporation S.A. that was written in Spanish. You can download a copy of the original letter here.
Quito, January 4 2010
Engineer
Juan Marcelo Vallejo M
EXECUTIVE PRESIDENT
CONTINENTAL CORPORATION S.A.
Cuenca-Ecuador
Respectfully:
We are glad to confirm that the EASI Electric Energy Savings and Efficiency System installed by your company in our facility CEDAL ( Corporacion Ecuatoriana de Aluminio S.A. CEDAL), is operating and functioning since March, 2009.
We can CERTIFY that all the work performed, such as: Initial Assessment of our facility, the Site Survey, Project Design and Proposal, Pre-installation Survey and Final Installation of the EASI Energy Savings and Efficiency system, have been done professionally and without affecting our operations.
The benefits of the system have been proven in the first Savings Verification report, achieving 11.73% monthly savings, an amount that exceeded the proposal savings percentage of 8.23%.
Also, our facility’s Power Quality has been improved substantially, especially in the reduction of Harmonics and the increase of our Electric System Capacity, allowing us to obtain an even better cost-benefit.
We want to acknowledge the benefits that we have obtained with this technology and wish the best success for the implementation of these systems in other commercial and industrial facilities.
Sincerely
CORPORACION ECUATORIANA DE ALUMINIO S.A. CEDAL
Bernardo Gomez C.
President |